GAIA Society for Self-Sufficiency DE EN

Neutrinovoltaics – field test interest

Neutrinovoltaics logo

when the solar cell no longer needs light

Field test survey

Interested in the Neutrinovoltaic® field test? Then seize the opportunity and fill in the form right away. You do not enter into any obligation by doing so. The final installation sites are to be selected so as to give as broad a picture as possible of applications in the home and to provide insights from real-world use that may be relevant for later series production. The Neutrino® Power Cubes used in the field test are individually hand-built, unique pre-series models that the Neutrino® Energy Group issues for use and takes back after the field test.

This field test heralds a new era of energy generation. Taking part is something for pioneers who want to be right at the forefront. Your willingness to engage in solution-oriented moderation and your discretion are particularly in demand. A basic technical understanding is an advantage. Think of yourself as the driver of a camouflaged prototype and actively help shape technical innovation in this field test.

Neutrino® Power Cube test – details according to currently available manufacturer information

  • Output (gross): approx. 6 … 7 kW
  • Own consumption: approx. 1 … 2 kW
  • Power output (net): approx. 5 … 6 kW
  • Connections expected to be available: AC 380 V (3-phase) and AC 220 V, DC 24/12 V and 5 V (USB)
  • Dimensions: approx. 800 x 400 x 600 mm
  • Weight: approx. 50 kg
  • Planned test duration: approx. 6 … 9 months
  • Energy availability: 24/7 … around the clock … independent of the weather

Neutrinovoltaics® information page

Illustration and properties reflect the current state of the art and may differ in the field test and in the later planned series production.

Data collection form

Notes

Energy of the future Neutrinovoltaics logo

Neutrinovoltaics & Neutrino® Power Cube

To get started with Neutrinovoltaics® and the work of the Neutrino® Energy Group, we invite you to find out more on these pages. Click the buttons or jump straight into the topic via the links below.

Neutrinovoltaics® information page

Field test planning (AT)

Neutrinovoltaics® — field test interest

Apply to take part in the field test with pre-series Power Cubes (100–150 units, 6–9 months). Non-binding, free of charge.

We store your details to notify you as soon as things get going — not for advertising. More in our privacy policy.

Translate

Machine translation by Google Translate. The page address is only sent to Google once you click — privacy.